# ORCHESTRATOR Handoff ## Role Own requirements alignment, task decomposition, dependency tracking, and final acceptance. ## Current Objective Maintain the shared Gitea-backed control plane, keep user-facing status current, and coordinate the next gate only after explicit user authorization. ## Must Read - `AGENT_BOARD.md` - `OPENCLAW_EXEC_NODE_PLAN.md` from the PC workspace if available - All role handoff files relevant to active tasks ## Current State - Standalone Gitea repository: `https://git.smartmotor.cloud/wangzhendong/openclaw-control-plane.git`. - PC local path: `D:\openclaw-control-plane`. - VPS target path: `/home/ubuntu/openclaw-control-plane`. - Access mode: HTTPS. - Default branch: `main`. - G0A collaboration mechanism is complete: the user confirmed agent roles, Git polling MVP, sync-health handling, `USER_STATUS.md` as user entry, and non-mutation/freeze boundaries. - G0B OpenClaw system requirements are complete: QQ and phone Control UI are current-stage control entries, VPS Gateway is the always-on hub, DeepSeek may trigger white-listed actions, Windows PC is the main execution node, Tailscale is optional, and G2/G3/G4 acceptance criteria are frozen. - G1 baseline is complete: PC and VPS baseline evidence were accepted by independent verifiers. - Strict `smartmotor.cloud` website freeze is a hard requirement during filing review. - Communication MVP uses polling Git sync scripts in `sync/` and task files in `tasks/`. - `USER_STATUS.md` is the user-facing status entry; internal agent ledgers should not be required reading for the user. - G2 and mutation-stage work are not authorized until the user explicitly opens the next stage. - `docs/G2_RUNBOOK.md` has been prepared as the G2 execution-before-action runbook. It does not authorize execution by itself. - The polling sync is intentionally temporary; design an async notification/coordinator layer when PC/VPS baseline work is stable. ## Next Actions 1. Ask the user whether to explicitly authorize G2 execution only after they review `docs/G2_RUNBOOK.md`. 2. Keep `USER_STATUS.md` current when gate, blocker, heartbeat, or required user decision changes. 3. Keep T7/CORRECTION monitoring active for sync-health, drift, missing evidence, and freeze-policy risk. 4. If the user authorizes G2 later, move T9-T13 from draft to ready in dependency order and require rollback notes before token/run/approval actions. 5. Track VPS verifier follow-up observations before future mutation: service path naming drift and Nginx route/config anomaly. 6. Do not open G2 or perform Gateway/node pairing until explicitly authorized. ## Open Questions - When should the user authorize G2 Gateway/node pairing? - When should the Git polling MVP be upgraded to webhook, Issues, OpenClaw events, or Cursor SDK based coordination? ## Last Update Prepared `docs/G2_RUNBOOK.md` and draft G2 tasks T9-T13. No PC/VPS command was executed, no token was handled, no node was started, no VPS approval was performed, and G2 remains closed until explicit user authorization. ## Frozen G0B Summary - QQ is included in the current stage as a primary natural-language entry. - Phone Control UI must be able to start basic tasks, show status/results, and approve high-risk actions. - VPS OpenClaw Gateway is the always-on hub for device connection, routing, approval flow, state aggregation, and audit. - DeepSeek may understand, split, and autonomously trigger white-listed actions. High-risk or non-white-listed actions require human approval. - Windows PC is the main execution node and may perform broad user-level local execution. - PC system-level changes, service installation, network/firewall changes, and large destructive file operations require human approval and rollback notes. - Tailscale is optional for administration, troubleshooting, and private-path enhancement. It is not a G2 prerequisite. - G2/G3/G4 acceptance criteria are recorded in `AGENT_BOARD.md`. ## G2 Planning State - T9: PC foreground node run, draft. - T10: VPS pairing approval, draft. - T11: PC G2 verification, draft. - T12: VPS G2 verification and freeze compliance, draft. - T13: G2 correction guard, draft. - Authorization judgment: prerequisites are sufficient to ask the user whether to authorize G2, but execution must not begin until the user explicitly grants that authorization.