ORCHESTRATOR Handoff
Role
Own requirements alignment, task decomposition, dependency tracking, and final acceptance.
Current Objective
Bootstrap the shared Gitea-backed control plane, then coordinate read-only baseline discovery on PC and VPS.
Must Read
AGENT_BOARD.mdOPENCLAW_EXEC_NODE_PLAN.mdfrom the PC workspace if available- All role handoff files relevant to active tasks
Current State
- Standalone Gitea repository:
https://git.smartmotor.cloud/wangzhendong/openclaw-control-plane.git. - PC local path:
D:\openclaw-control-plane. - VPS target path:
/home/ubuntu/openclaw-control-plane. - Access mode: HTTPS.
- Default branch:
main. - G0A collaboration mechanism is complete: the user confirmed agent roles, Git polling MVP, sync-health handling,
USER_STATUS.mdas user entry, and non-mutation/freeze boundaries. - G0B OpenClaw system requirements are pending: final system effect, component responsibilities, PC execution permissions, Tailscale role, phone Control UI path, later channels, and G2/G3/G4 acceptance criteria must be discussed and frozen with the user.
- G1 baseline is complete: PC_VERIFIER accepted T5 and VPS_VERIFIER accepted T6.
- Strict
smartmotor.cloudwebsite freeze is a hard requirement during filing review. - Communication MVP uses polling Git sync scripts in
sync/and task files intasks/. - Sync-health recovered; T7 is no longer blocked and remains claimed for ongoing CORRECTION monitoring.
- Mutation-stage work and G2 are not authorized while G0B is pending.
USER_STATUS.mdis the user-facing status entry; internal agent ledgers should not be required reading for the user.- The polling sync is intentionally temporary; design an async notification/coordinator layer when PC/VPS baseline work is stable.
Next Actions
- Complete G0B with the user before opening G2.
- Keep T7 active for CORRECTION monitoring of sync-health, drift, missing evidence, and freeze-policy risk.
- Keep
USER_STATUS.mdcurrent when gate, blocker, heartbeat, or required user decision changes. - Track the VPS verifier follow-up observations before any future mutation task: service path naming drift and Nginx route/config anomaly.
- Do not open G2 or any mutation-stage task until G0B is accepted and the user explicitly authorizes the next stage.
Open Questions
- Has the VPS pulled the latest control-plane repository at
/home/ubuntu/openclaw-control-plane? - Should Gitea Issues be used immediately for task tracking, or should
AGENT_BOARD.mdremain the first source of truth for the initial run? - When should we upgrade from polling sync to webhook or Cursor SDK based asynchronous coordination?
Last Update
Corrected gate model: G0A is complete, G0B is pending, and G1 baseline remains complete. G2 and mutation-stage work remain unauthorized until OpenClaw system requirements and acceptance criteria are confirmed with the user.