10 KiB
ORCHESTRATOR Handoff
Role
Own requirements alignment, task decomposition, dependency tracking, and final acceptance.
Current Objective
Coordinate freshly authorized G2 execution strictly under docs/G2_RUNBOOK.md: T13 guard and T9 foreground PC node run may proceed; T10 remains blocked until T9 evidence provides one matching non-secret request/node ID.
Must Read
AGENT_BOARD.mdOPENCLAW_EXEC_NODE_PLAN.mdfrom the PC workspace if available- All role handoff files relevant to active tasks
Current State
- Standalone Gitea repository:
https://git.smartmotor.cloud/wangzhendong/openclaw-control-plane.git. - PC local path:
D:\openclaw-control-plane. - VPS target path:
/home/ubuntu/openclaw-control-plane. - Access mode: HTTPS.
- Default branch:
main. - G0A collaboration mechanism is complete: the user confirmed agent roles, Git polling MVP, sync-health handling,
USER_STATUS.mdas user entry, and non-mutation/freeze boundaries. - G0B OpenClaw system requirements are complete: QQ and phone Control UI are current-stage control entries, VPS Gateway is the always-on hub, DeepSeek may trigger white-listed actions, Windows PC is the main execution node, Tailscale is optional, and G2/G3/G4 acceptance criteria are frozen.
- G1 baseline is complete: PC and VPS baseline evidence were accepted by independent verifiers.
- Strict
smartmotor.cloudwebsite freeze is a hard requirement during filing review. - Communication MVP uses polling Git sync scripts in
sync/and task files intasks/. USER_STATUS.mdis the user-facing status entry; internal agent ledgers should not be required reading for the user.- Fresh second G2 authorization was received and reconfirmed for ORCHESTRATOR in
D:\openclaw-control-planeon 2026-05-19. docs/G2_RUNBOOK.mdhas been prepared as the G2 execution-before-action runbook. It does not authorize execution by itself.- Sync-health is currently healthy: tracked PC and VPS heartbeats are present and clean, and no
sync-state/error-*.mdfiles are observed in the latest control-plane snapshot. - T2.1 and T8 are now treated as complete control-plane setup work; G2 is In Progress under the limited runbook scope.
- The polling sync is intentionally temporary; design an async notification/coordinator layer when PC/VPS baseline work is stable.
- Filing-review freeze path wording has been corrected from the obsolete single
docker-composite.ymlreference to/opt/services/docker-compose.openclaw.ymlplus any equivalent compose/service entries that could affect public website output.
Next Actions
- Keep
USER_STATUS.mdcurrent when gate, blocker, heartbeat, or required user decision changes. - Keep T7/CORRECTION monitoring active for sync-health, drift, missing evidence, and freeze-policy risk.
- Let CORRECTION claim T13 and verify sync/secret/freeze guardrails before or alongside T9.
- Let PC_EXECUTOR claim T9, write
rollback/pc-g2-node-run-YYYYMMDD.md, set token only in the local shell/session without recording it, and run only the foreground node command indocs/G2_RUNBOOK.md. - Keep T10 blocked until T9 evidence includes a matching non-secret pairing request ID or pending node ID.
- Continue forbidding service persistence,
openclaw node install/start, Nginx/Docker/website changes, firewall/network changes, G3 smoke test, G4 setup, and recording any token or secret.
Open Questions
- When will T9 produce a matching non-secret pairing request ID or pending node ID for possible T10 approval?
- When should the Git polling MVP be upgraded to webhook, Issues, OpenClaw events, or Cursor SDK based coordination?
Last Update
2026-05-19 12:27 UTC+8: ORCHESTRATOR took over after role-misdirection audit and paused G2 execution.
- VPS_VERIFIER self-reported that prompts intended for ORCHESTRATOR were mistakenly sent to VPS_VERIFIER.
- CORRECTION found cross-role control-plane edits from VPS-origin commits but no evidence of live G2 approval, token handling, service restart/reload, Gateway config mutation, Nginx/Docker/website mutation, or secret leak.
- ORCHESTRATOR adopts
docs/G2_RUNBOOK.mdas planning material only, but corrects the active state: G2 is Pending, T9/T10/T13 are blocked, and fresh explicit user authorization is required before any G2 execution. - No PC/VPS command was executed by ORCHESTRATOR during this correction.
2026-05-19 12:34 UTC+8: Generated docs/G2_AUTHORIZATION_CARD.md.
- Confirmed current target role is ORCHESTRATOR and workspace is
D:\openclaw-control-plane. - Confirmed G2 is paused/pending and old authorization must not be reused.
- Confirmed tracked sync-health is healthy: PC and VPS heartbeats are clean and no
sync-state/error-*.mdfiles were observed. - No PC/VPS command was executed, no token was handled, no node was started, and no VPS approval was performed.
2026-05-19 12:37 UTC+8: Fresh second G2 authorization received in the correct target window/workspace.
- Target role/workspace confirmed: ORCHESTRATOR in
D:\openclaw-control-plane. - Sync-health confirmed healthy by tracked files: PC and VPS heartbeats are clean, and no
sync-state/error-*.mdfiles were observed. - G2 moved to In Progress under the limited runbook scope.
- T13 and T9 are ready; T10 remains blocked until T9 evidence provides a matching non-secret request/node ID.
- ORCHESTRATOR did not execute PC/VPS commands, did not handle a token, did not start a node, and did not approve pairing.
2026-05-19 14:44 UTC+8: Fresh second G2 authorization was repeated in the correct target window/workspace.
- Target role/workspace confirmed again: ORCHESTRATOR in
D:\openclaw-control-plane. - Sync-health confirmed healthy again by tracked files: PC and VPS heartbeats are clean, and no
sync-state/error-*.mdfiles were observed. - Existing state remains correct: G2 In Progress, T13/T9 Ready, T10 Blocked until T9 evidence provides a matching non-secret request/node ID.
- ORCHESTRATOR did not execute PC/VPS commands, did not handle a token, did not start a node, and did not approve pairing.
2026-05-19 12:16 UTC+8: Prior G2 authorization record is superseded by the 12:27 role-misdirection correction.
- Previously recorded allowed scope: foreground PC node run and corresponding VPS pairing approval under
docs/G2_RUNBOOK.md. - Current corrected state: this authorization is paused and must not be used for execution without fresh explicit user confirmation.
- T9/T10/T13 are blocked.
- G2 quality gate is Pending, not in progress and not accepted.
- No PC/VPS command was executed by ORCHESTRATOR, no token was handled, no node was started here, no VPS approval was performed here, and no service was modified.
2026-05-19 12:11 UTC+8: Completed G2 authorization-before-execution control-plane cleanup.
docs/G2_RUNBOOK.mdis complete as the G2 pre-execution runbook.USER_STATUS.mdwas refreshed with current sync-health snapshot and states that G2 is not authorized.AGENT_BOARD.mdkeeps G2 Pending and marks T2.1/T8 Done.- Filing freeze references now use
/opt/services/docker-compose.openclaw.ymland any equivalent website-affecting compose/service entries, instead of relying on the obsolete singledocker-composite.ymlpath. - No PC/VPS command was executed, no token was handled, no node was started, no VPS approval was performed, and no service was modified.
- Next step: wait for explicit user authorization before opening G2 execution tasks.
Frozen G0B Summary
- QQ is included in the current stage as a primary natural-language entry.
- Phone Control UI must be able to start basic tasks, show status/results, and approve high-risk actions.
- VPS OpenClaw Gateway is the always-on hub for device connection, routing, approval flow, state aggregation, and audit.
- DeepSeek may understand, split, and autonomously trigger white-listed actions. High-risk or non-white-listed actions require human approval.
- Windows PC is the main execution node and may perform broad user-level local execution.
- PC system-level changes, service installation, network/firewall changes, and large destructive file operations require human approval and rollback notes.
- Tailscale is optional for administration, troubleshooting, and private-path enhancement. It is not a G2 prerequisite.
- G2/G3/G4 acceptance criteria are recorded in
AGENT_BOARD.md.
G2 Planning State
- T9: PC foreground node run, ready.
- T10: VPS pairing approval, blocked until T9 evidence.
- T11: PC G2 verification, draft.
- T12: VPS G2 verification and freeze compliance, draft.
- T13: G2 correction guard, ready.
- Authorization judgment: fresh second authorization is valid only for the G2 runbook scope and expires if sync blocks, role/workspace mismatches, secrets appear, pairing identity is ambiguous, steps drift from the runbook, or freeze risk appears.
Session Freeze - 2026-05-19 14:46 UTC+8
Current phase: G2 limited foreground pairing is authorized under docs/G2_RUNBOOK.md.
Completed:
- G0A, G0B, and G1 accepted.
- Role-misdirection recovery completed and second G2 authorization reconfirmed.
- G2 control plane opened only for T13 and T9.
Blocked:
- T10 remains blocked until T9 evidence contains one matching non-secret pairing request/node ID.
- G3 smoke test and G4 persistence remain closed.
Safety constraints:
- Do not record secrets or
OPENCLAW_GATEWAY_TOKEN. - Do not run
openclaw node install/start. - Do not perform service persistence, service restart, Nginx/Docker/website/firewall/network changes, or public port exposure.
Next owner: PC_EXECUTOR for T9, with CORRECTION monitoring T13.
Single next action: PC_EXECUTOR claims T9, writes rollback/pc-g2-node-run-YYYYMMDD.md, then follows only the foreground node flow in docs/G2_RUNBOOK.md.
Resume prompt:
You are ORCHESTRATOR resuming OpenClaw G2.
Read USER_STATUS.md, AGENT_BOARD.md, handoff/ORCHESTRATOR.md, tasks/T9-G2-PC-node-run.md, tasks/T10-G2-VPS-pairing-approve.md, tasks/T13-G2-correction-guard.md, docs/G2_RUNBOOK.md, and sync-state/README.md.
Current state: G2 is In Progress under limited runbook scope; T13 and T9 are Ready; T10 is Blocked until T9 produces one matching non-secret pairing request/node ID.
Do not execute PC/VPS commands from ORCHESTRATOR. Do not handle or record secrets. Keep G3/G4 closed.