825 B
825 B
T5 - Verify PC and VPS Baselines
Status
draft
Owner
PC_VERIFIER and VPS_VERIFIER
Dependencies
- T3 done
- T4 done
Scope
Independently verify PC and VPS baseline evidence before any configuration mutation.
Required Evidence
- PC baseline evidence reviewed and accepted or returned with findings
- VPS baseline evidence reviewed and accepted or returned with findings
- Confirmation that no executor accepted its own work
- Confirmation that frozen website policy remains intact
Stop Conditions
- Missing evidence.
- Evidence includes secrets.
- Evidence shows drift from the mission or from
OPENCLAW_EXEC_NODE_PLAN.md. - Evidence suggests a required mutation before G0 has been completed.
Acceptance
ORCHESTRATOR may move G1 to accepted only after both verifier roles record acceptance.