# ORCHESTRATOR Handoff
## Role
Own requirements alignment, task decomposition, dependency tracking, and final acceptance.
## Current Objective
Coordinate authorized G2 execution strictly under `docs/G2_RUNBOOK.md`: foreground PC node run first, then corresponding VPS pairing approval only after a matching non-secret request/node ID exists.
## Must Read
- `AGENT_BOARD.md`
- `OPENCLAW_EXEC_NODE_PLAN.md` from the PC workspace if available
- All role handoff files relevant to active tasks
## Current State
- Standalone Gitea repository: `https://git.smartmotor.cloud/wangzhendong/openclaw-control-plane.git`.
- PC local path: `D:\openclaw-control-plane`.
- VPS target path: `/home/ubuntu/openclaw-control-plane`.
- Access mode: HTTPS.
- Default branch: `main`.
- G0A collaboration mechanism is complete: the user confirmed agent roles, Git polling MVP, sync-health handling, `USER_STATUS.md` as user entry, and non-mutation/freeze boundaries.
- G0B OpenClaw system requirements are complete: QQ and phone Control UI are current-stage control entries, VPS Gateway is the always-on hub, DeepSeek may trigger white-listed actions, Windows PC is the main execution node, Tailscale is optional, and G2/G3/G4 acceptance criteria are frozen.
- G1 baseline is complete: PC and VPS baseline evidence were accepted by independent verifiers.
- Strict `smartmotor.cloud` website freeze is a hard requirement during filing review.
- Communication MVP uses polling Git sync scripts in `sync/` and task files in `tasks/`.
- `USER_STATUS.md` is the user-facing status entry; internal agent ledgers should not be required reading for the user.
- G2 is authorized as of 2026-05-19, limited to foreground PC node run and corresponding VPS pairing approval under `docs/G2_RUNBOOK.md`.
- `docs/G2_RUNBOOK.md` has been prepared as the G2 execution-before-action runbook. It does not authorize execution by itself.
- Sync-health is currently healthy: tracked PC and VPS heartbeats are present and clean, and no `sync-state/error-*.md` files are observed in the latest control-plane snapshot.
- T2.1 and T8 are now treated as complete control-plane setup work; G2 remains Pending.
- The polling sync is intentionally temporary; design an async notification/coordinator layer when PC/VPS baseline work is stable.
- Filing-review freeze path wording has been corrected from the obsolete single `docker-composite.yml` reference to `/opt/services/docker-compose.openclaw.yml` plus any equivalent compose/service entries that could affect public website output.
## Next Actions
1. Let PC_EXECUTOR claim T9, write `rollback/pc-g2-node-run-YYYYMMDD.md`, set the Gateway token only in the local shell/session without recording it, and run only the foreground PC node command from `docs/G2_RUNBOOK.md`.
2. Keep `USER_STATUS.md` current when gate, blocker, heartbeat, or required user decision changes.
3. Keep T7/CORRECTION monitoring active for sync-health, drift, missing evidence, and freeze-policy risk.
4. Keep T10 draft until T9 evidence includes a matching non-secret pairing request ID or pending node ID.
5. When T10 becomes eligible, require `rollback/vps-g2-approve-YYYYMMDD.md` before approval and approve only the matching request/node.
6. Continue forbidding service persistence, `openclaw node install/start`, Nginx/Docker/website changes, firewall/network changes, and recording any token or secret.
## Open Questions
- When should the user authorize G2 Gateway/node pairing?
- When should the Git polling MVP be upgraded to webhook, Issues, OpenClaw events, or Cursor SDK based coordination?
## Last Update
2026-05-19 12:16 UTC+8: User authorized G2 with strict scope.
- Allowed scope: foreground PC node run and corresponding VPS pairing approval under `docs/G2_RUNBOOK.md`.
- T9 and T13 are ready; T10 remains draft until T9 provides a matching non-secret request/node ID.
- G2 quality gate is In Progress, not accepted.
- No PC/VPS command was executed by ORCHESTRATOR, no token was handled, no node was started here, no VPS approval was performed here, and no service was modified.
2026-05-19 12:11 UTC+8: Completed G2 authorization-before-execution control-plane cleanup.
- `docs/G2_RUNBOOK.md` is complete as the G2 pre-execution runbook.
- `USER_STATUS.md` was refreshed with current sync-health snapshot and states that G2 is not authorized.
- `AGENT_BOARD.md` keeps G2 Pending and marks T2.1/T8 Done.
- Filing freeze references now use `/opt/services/docker-compose.openclaw.yml` and any equivalent website-affecting compose/service entries, instead of relying on the obsolete single `docker-composite.yml` path.
- No PC/VPS command was executed, no token was handled, no node was started, no VPS approval was performed, and no service was modified.
- Next step: wait for explicit user authorization before opening G2 execution tasks.
## Frozen G0B Summary
- QQ is included in the current stage as a primary natural-language entry.
- Phone Control UI must be able to start basic tasks, show status/results, and approve high-risk actions.
- VPS OpenClaw Gateway is the always-on hub for device connection, routing, approval flow, state aggregation, and audit.
- DeepSeek may understand, split, and autonomously trigger white-listed actions. High-risk or non-white-listed actions require human approval.
- Windows PC is the main execution node and may perform broad user-level local execution.
- PC system-level changes, service installation, network/firewall changes, and large destructive file operations require human approval and rollback notes.
- Tailscale is optional for administration, troubleshooting, and private-path enhancement. It is not a G2 prerequisite.
- G2/G3/G4 acceptance criteria are recorded in `AGENT_BOARD.md`.
## G2 Planning State
- T9: PC foreground node run, draft.
- T10: VPS pairing approval, draft.
- T11: PC G2 verification, draft.
- T12: VPS G2 verification and freeze compliance, draft.
- T13: G2 correction guard, draft.
- Authorization judgment: prerequisites are sufficient to ask the user whether to authorize G2, but execution must not begin until the user explicitly grants that authorization.